 |
Wires
for the 480 volt 3 phase motors are pulled through 6 inch underground
pipes and routed back to the control house by the ET Kimble company.
Martin Valois and Donnie Robinette from Astec run the fiber optics from remote terminal to
the control house to link the network all together. |
 |
|

|
Where
wire could not be routed under ground, wire troughs carry the wiring
overhead and around corners. Mike organizes the wires and secures
them in place.
|
|
|